Change page style: 

Special proposals require 2016A PIT

In preparation for the start of 2016A, all Fast Turnaround (FT), Director's Discretionary (DD) time, and Poor Weather (PW) proposals must use the 2016A Phase I Tool (PIT). See the PIT Version Table for more information and download links.

This is a read only mirror of http://www.gemini.edu

Information On Gemini Website Mirrors